The Quality Assurance Department is an independent department reporting directly to the company management. Their responsibility includes that the quality procedures are used during the project execution.
 
The below documents are used to administer the audit and control by the QA Department on the use of the quality procedures.
 
Number(.PDF) Description
RB28010 Process Engineering, Project System Audit
RB28011 Systems Engineering, Group, Project System Audit
RB28012 Project and Engineering Management, Project System Audit
RB28013 Planning and Scheduling Group, Project System Audit
RB28014 Cost Engineering Group, Project System Audit
RB28015 Material Control Group, Project System Audit
RB28016 Plotplans, Project System Audit
RB28017 Bulk (Piping) Take-off, Project System Audit
RB28018 Piping Design Group, Project System Audit
RB28020 Piping Engineering Group, Project System Audit
RB28021 Electrial Group, Project System Audit
RB28022 Control Systems Group, Project System Audit
RB28023 Mechanical Equipment Group, Project System Audit
RB28024 Civil Group, Project System Audit
RB28025 Architectural Group, Project System Audit
RB28026 Architectural Consultan, Project System Audit
RB28027 Structural Steel Group, Project System Audit
RB28028 Purchasing Group, Project System Audit
RB28029 Inspection Group, Project System Audit
RB28030 Expediting Group, Project System Audit
RB28031 Traffic Control Group, Project System Audit
RB28032 Vendor Print Control Group, Project System Audit
RB28033 Subcontracting Group, Project System Audit
RB28034 HO Construction, Project System Audit
RB28035 Site Construction, Project System Audit
RB28036 Subcontractors on Site, Project System Audit
RB28037 Construction Environmental, Health and Safet (EH&S), Project System
RB28038 Authority Engineering Group, Project System Audit
RB28039 Painting/Insulation Group, Project System Audit
RB28040 Environment, Health&Safety (EH&S) Group, Project System Audit
RB28041 Checklist for Annual Management Assessment