J - Foundations
| Stem sub | Rest | Detail | Level | UoM | Description |
|---|---|---|---|---|---|
| J | 1 | M3 | Foundations | ||
| J* | 2 | Foundation Group | |||
| JJ | 2 | M3 | Equipment & Structure Foundations | ||
| JB | 2 | M3 | Building Foundations | ||
| JC | 2 | M3 | Concrete Sewer & Firewater Pits | ||
| JE | 2 | M3 | Civil Work Electr. & Instrum. | ||
| JP | 2 | M2 | Paving | ||
| JL | 2 | EA | Piling | ||
| JM | 2 | M3 | Earthwork | ||
| JG | 2 | M3 | Grouting | ||
| JJ | * | 3 | Foundation Function | ||
| JJ | ** | 4 | Foundation Function Details | ||
| JJ | A | 3 | M3 | Equipment Foundation | |
| JJ | A1 | 4 | M3 | Towers & Vertical Vessels | |
| JJ | A2 | 4 | M3 | Horizontal Vessels & Exchangers | |
| JJ | A3 | 4 | M3 | Pumps | |
| JJ | A4 | 4 | M3 | Compressors | |
| JJ | A5 | 4 | M3 | Fired Equipment & /Package Units | |
| JJ | A6 | 4 | M3 | Storage Tanks | |
| JJ | A7 | 4 | M3 | Miscellaneous Items | |
| JJ | D | 3 | M3 | Structure Foundation | |
| JJ | D1 | 4 | M3 | Equipment Supporting Structures | |
| JJ | D2 | 4 | M3 | Pipe Supporting Structures | |
| JJ | D3 | 4 | M3 | Sheds | |
| JJ | D4 | 4 | M3 | Noise Walls | |
| JJ | __* | 5 | Construction Component | ||
| JJ | __*** | 6 | Construction Component Details | ||
| JJ | __1 | 5 | M3 | Concrete | |
| JJ | __11 | 6 | M3 | Concrete | |
| JJ | __12 | 6 | M3 | Blinding | |
| JJ | __13 | 6 | M2 | Formwork | |
| JJ | __14 | 6 | KG | Bolts | |
| JJ | __15 | 6 | KG | Inserts | |
| JJ | __2 | 5 | KG | Rebar | |
| JJ | __21 | 6 | KG | Mild Steel Bars | |
| JJ | __22 | 6 | KG | High Tensile Steel Bars | |
| JJ | __23 | 6 | KG | Wire Meshes | |
| JJ | __3 | 5 | EA | Prefabrication | |
| JJ | __5 | 5 | EA | Coating & Linings | |
| JJ | __51 | 6 | EA | Asphalt Coating | |
| JJ | __52 | 6 | EA | Acid Resistant Lining | |
| JJ | __9 | 5 | EA | Foundation Modifications | |
| JJ | __91 | 6 | M3 | Break-up/Removal | |
| JJ | __92 | 6 | M2 | Surface Preparation | |
| JJ | __92A | 6 | M2 | Chipping-off | |
| JJ | __92B | 6 | M2 | Roughening | |
| JJ | __92Z | 6 | M2 | Other | |
| JJ | __93 | 6 | EA | Anchor Installation | |
| JJ | __93A | 6 | EA | Drilling Holes | |
| JJ | __93B | 6 | EA | Grout-in Achor Bars | |
| JJ | __93C | 6 | EA | Fixing Dowel Bar | |
| JJ | __93 | ** | 10 | EA | Size Depth cm |
| JJ | __93 | .. | 10 | EA | - Any Number - |
| JJ | __93 | ___*** | 14 | EA | Size Diameter mm |
| JJ | __93 | ___... | 14 | EA | - Any Number - |
| Stem sub | Rest | Detail | Level | UoM | Description |
|---|---|---|---|---|---|
| JB | * | 3 | M3 | Building Group | |
| JB | ** | 4 | M3 | Building Function | |
| JB | A | 3 | M3 | Administration Buildings | |
| JB | A1 | 4 | M3 | Office Buildings | |
| JB | A2 | 4 | M3 | Laboratory Buildings | |
| JB | A3 | 4 | M3 | Change Houses | |
| JB | A4 | 4 | M3 | General Purpose Buildings | |
| JB | E | 3 | M3 | Electrical Buildings | |
| JB | E1 | 4 | M3 | Main Stations | |
| JB | E2 | 4 | M3 | Substations | |
| JB | E3 | 4 | M3 | Emergency Generator Buildings | |
| JB | F | 3 | M3 | Service Buildings | |
| JB | F1 | 4 | M3 | Fire Stations | |
| JB | F2 | 4 | M3 | Garages | |
| JB | F3 | 4 | M3 | Truck Loading Offices | |
| JB | F4 | 4 | M3 | Weigh Houses | |
| JB | F5 | 4 | M3 | Guard Houses | |
| JB | G | 3 | M3 | Process Buildings | |
| JB | G1 | 4 | M3 | Process Buildings | |
| JB | K | 3 | M3 | Control System Buildings | |
| JB | K1 | 4 | M3 | Control Buildings | |
| JB | K2 | 4 | M3 | Analyser Houses | |
| JB | M | 3 | M3 | Maintenance Buildings | |
| JB | M1 | 4 | M3 | Maintenance Buildings | |
| JB | P | 3 | M3 | Pump & Compressor Houses | |
| JB | P1 | 4 | M3 | Compressor Sheds | |
| JB | P2 | 4 | M3 | Firewater Pump Houses | |
| JB | P3 | 4 | M3 | Pump Houses | |
| JB | P4 | 4 | M3 | Boiler Houses | |
| JB | S | 3 | M3 | Storage Buildings & Warehouses | |
| JB | S1 | 4 | M3 | Storage Buildings | |
| JB | S2 | 4 | M3 | Warehouses | |
| JB | __* | 5 | Construction Component | ||
| JB | __** | 6 | Construction Component Details | ||
| JB | __1 | 5 | M3 | Concrete | |
| JB | __11 | 6 | M3 | Concrete | |
| JB | __12 | 6 | M3 | Blinding | |
| JB | __13 | 6 | M2 | Formwork | |
| JB | __14 | 6 | KG | Bolts | |
| JB | __15 | 6 | KG | Inserts | |
| JB | __2 | 5 | KG | Rebar | |
| JB | __21 | 6 | KG | Mild Steel Bars | |
| JB | __22 | 6 | KG | High Tensile Steel Bars | |
| JB | __23 | 6 | KG | Wire Meshes | |
| JB | __3 | 5 | EA | Prefabrication |
| Stem sub | Rest | Detail | Level | UoM | Description |
|---|---|---|---|---|---|
| JC | * | 3 | System Function | ||
| JC | F | 3 | M3 | Firefighting Systems | |
| JC | Q | 3 | M3 | Sewer Systems | |
| JC | _* | 4 | Item Type | ||
| JC | _1 | 4 | M3 | Manholes | |
| JC | _2 | 4 | M3 | Catchbasins | |
| JC | _3 | 4 | M3 | Valve Pits | |
| JC | _4 | 4 | M3 | Sump Pits | |
| JC | _5 | 4 | M3 | Foundation Slabs | |
| JC | _6 | 4 | M3 | Anchor Blocks | |
| JC | _7 | 4 | M3 | Concrete Bedding | |
| JC | _8 | 4 | M3 | Clean-outs | |
| JC | _9 | 4 | M3 | Gutters | |
| JC | __* | 5 | Construction Component | ||
| JC | __** | 6 | Construction Component Details | ||
| JC | __1 | 5 | M3 | Concrete | |
| JC | __11 | 6 | M3 | Concrete | |
| JC | __12 | 6 | M3 | Blinding | |
| JC | __13 | 6 | M2 | Formwork | |
| JC | __14 | 6 | KG | Bolts | |
| JC | __15 | 6 | KG | Inserts | |
| JC | __2 | 5 | KG | Rebar | |
| JC | __21 | 6 | KG | Mild Steel Bars | |
| JC | __22 | 6 | KG | High Tensile Steel Bars | |
| JC | __23 | 6 | KG | Wire Meshes | |
| JC | __3 | 5 | EA | Prefabrication | |
| JC | __31 | 6 | M3 | 0- 5 m3 Pit volume | |
| JC | __32 | 6 | M3 | 5-10 m3 Pit volume | |
| JC | __33 | 6 | M3 | 10-20 m3 Pit volume | |
| JC | __34 | 6 | M3 | > 20 m3 Pit volume | |
| JC | __4 | 5 | EA | Covers | |
| JC | __41 | 6 | EA | Cast Iron Cover | |
| JC | __42 | 6 | EA | Grating Cover | |
| JC | __5 | 5 | EA | Coating & Linings | |
| JC | __51 | 6 | EA | Asphalt Coating | |
| JC | __52 | 6 | EA | Acid Resistant Lining | |
| JE | * | 3 | Civil Work Function | ||
| JE | E | 3 | M3 | Civil Work for Electrical | |
| JE | K | 3 | M3 | Civil Work for Instrumentation | |
| JE | _* | 4 | Item Type | ||
| JE | _1 | 4 | M2 | Cable Protection Tiles | |
| JE | _2 | 4 | M2 | Cable Trench Walls | |
| JE | _3 | 4 | M | Conduits | |
| JE | _4 | 4 | M3 | Cable Pulling Boxes | |
| JE | _5 | 4 | M3 | Formstones | |
| JE | _6 | 4 | M3 | Cable Gutters | |
| JE | _7 | 4 | M3 | Road Crossing Channels | |
| JE | _8 | 4 | M3 | Embedded PVC Conduit | |
| JE | __* | 5 | Construction Component | ||
| JE | __** | 6 | Construction Component Details |
| Stem sub | Rest | Detail | Level | UoM | Description |
|---|---|---|---|---|---|
| JE | __1 | 5 | M3 | Concrete | |
| JE | __11 | 6 | M3 | Concrete | |
| JE | __12 | 6 | M3 | Blinding | |
| JE | __13 | 6 | M2 | Formwork | |
| JE | __14 | 6 | KG | Bolts | |
| JE | __15 | 6 | KG | Inserts | |
| JE | __2 | 5 | KG | Rebar | |
| JE | __21 | 6 | KG | Mild Steel Bars | |
| JE | __22 | 6 | KG | High Tensile Steel Bars | |
| JE | __23 | 6 | KG | Wire Meshes | |
| JE | __3 | 5 | EA | Prefabrication | |
| JP | * | 3 | Paving Type | ||
| JP | ** | 4 | Paving Component | ||
| JP | A | 3 | M2 | Asphalt Paving | |
| JP | A1 | 4 | M2 | Sub Base | |
| JP | A2 | 4 | M2 | Base Course | |
| JP | A3 | 4 | M2 | Wearing Course | |
| JP | A4 | 4 | M2 | Top Layer | |
| JP | B | 3 | M2 | Brick Paving | |
| JP | B1 | 4 | M2 | Concrete | |
| JP | B2 | 4 | M2 | Clay | |
| JP | C | 3 | M2 | Concrete Paving | |
| JP | C1 | 4 | M2 | Slabs | |
| JP | C2 | 4 | M3 | Curbs | |
| JP | C3 | 4 | M3 | Downstands | |
| JP | C4 | 4 | M3 | Plinths | |
| JP | C5 | 4 | M2 | Wire Meshes | |
| JP | C6 | 4 | M | Joints | |
| JP | C7 | 4 | M2 | Coloured Concrete | |
| JP | G | 3 | M2 | Gravel Paving | |
| JP | G1 | 4 | M2 | Gravel Paving | |
| JP | G2 | 4 | M2 | Crushed Stone Paving | |
| JP | G3 | 4 | M2 | Slags Paving | |
| JP | T | 3 | M2 | Tiles | |
| JP | T1 | 4 | M2 | Concrete Tiles | |
| JP | T2 | 4 | M2 | Ceramic Tiles | |
| JP | T3 | 4 | M2 | Stelcon(type) Slabs | |
| JP | *** | 5 | Paving Thickness (mm) | ||
| JP | ... | 5 | - any number - | ||
| JL | * | 3 | EA | Pile Type | |
| JL | F | 3 | EA | Fabricated In-Situ | |
| JL | S | 3 | EA | Prefabricated | |
| JL | _* | 4 | Pile Type Details | ||
| JL | _1 | 4 | EA | Reinforced | |
| JL | _2 | 4 | EA | Prestressed | |
| JL | _3 | 4 | EA | Bored | |
| JL | _4 | 4 | EA | Driven Temporary Casing | |
| JL | _5 | 4 | EA | Driven Permanent Casing | |
| JL | _6 | 4 | EA | Composite | |
| JL | _7 | 4 | EA | Wood | |
| JL | _8 | 4 | EA | Steel |
| Stem sub | Rest | Detail | Level | UoM | Description |
|---|---|---|---|---|---|
| JL | ___*** | 5 | Bearing Capacity (tonne) | ||
| JL | ___... | 5 | EA | - any number - | |
| JL | *** | 6 | Pile Length (m) | ||
| JL | ... | 6 | EA | - any number - | |
| JL | ____** | 7 | Pile Diameter (cm) | ||
| JL | ____.. | 7 | EA | - any number - | |
| JM | * | 3 | Groundwork Function | ||
| JM | C | 3 | M3 | Process Piping | |
| JM | E | 3 | M3 | Electrical Cables | |
| JM | F | 3 | M3 | Firewater Lines | |
| JM | J | 3 | M3 | Foundations | |
| JM | K | 3 | M3 | Instrumentation Cables | |
| JM | Q | 3 | M3 | Sewers | |
| JM | _* | 4 | Groundwork Type | ||
| JM | _1 | 4 | M3 | Excavation | |
| JM | _2 | 4 | M3 | Backfilling | |
| JM | _3 | 4 | M3 | Transportion | |
| JM | _4 | 4 | LT | Dewatering | |
| JM | _5 | 4 | LT | Planking & Strutting | |
| JM | __* | 5 | Execution Method | ||
| JM | __H | 5 | M3 | By Hand | |
| JM | __M | 5 | M3 | By Machine | |
| JG | * | 3 | Grouting Material | ||
| JG | A | 3 | M3 | Embeco | |
| JG | B | 3 | M3 | Epoxy | |
| JG | C | 3 | M3 | Sand-Cement |