Table of Contents
13.1 Scope
13.2 Before Erection
13.3 Pre-setting Check
13.4 Post-setting Check
13.5 Vessels
13.6 Exchangers
13.7 Heaters
13.8 Tower Inspection Procedure
13.9 Tanks
13.10 References
FORMS (Typical Examples Attached)
26M01 Equipment Incoming Inspection Record
26M02 Inspection Record for Towers/Vessels and Closing Certificate
26M03 Inspection and Test Record for Tanks and Closing Certificate
26M04 Tank Test Certificate
26M05 Record of Vessel Tests
26M06 New Equipment Data - Radiograph Inspection Report
26M07 Inspection Record for Exchangers
26M08 Inspection Record for Air Coolers
26M09 Run-In Test Record for Air Coolers
26M10 Inspection Record for Mixers
26M11 Inspection Record for Cooling Towers and Closing Certificate
26M12 Inspection Record for Furnaces/Boilers and Closing Certificate
26M13 Inspection Record for Packaged Boiler Units and Closing Certificate
26M14 Inspection Record for Packaged Units: Vessels/Columns/Skids/Filters and Closing Certificate
26M15 Inspection and Test Record for Travelling Cranes
26M16 Inspection and Test Record for Elevator and Hydraulic Lift Table
26M17 Pressure Test Record
13. Mechanical Equipment Inspection and Testing
13.1 Scope
The purpose of this section is to provide guidelines to Company personnel, in particular to the Construction Specialists, for the inspection and testing of mechanical equipment (excluding rotating mechanical equipment; for these see Reference 13.10.1).
Primary responsibility for quality is that of the subcontractor who shall satisfy himself through his own quality system that specified requirements are met.
It is the responsibility of the Construction Specialists to ensure that the subcontractor is in fact effectively applying his quality system and obtaining acceptable results.
Equipment to be erected may be classified into these main groupings:
( ... )
The full procedure is available for registered users.