1. Scope
This guide provides a series of questions useful as a checklist when auditing a quality system established by a supplier.
2. Reference
The execution of this procedure must be done in conjunction with the following procedures:
Document | Title | Level |
CM-QA-001 | Internal Quality | 2 |
CM-PE-700 | The Capability Assesment of Vendors and Supplies | 2 |
BN-UPI-315 | Vendor/Supplier assessment | 5 |
3. General
Evaluation of the vendor's quality system by means of an audit forms an integral and necessary part of a vendor evaluation.
The series of questions in Attachment 2 can be used as a guideline in the audit. The questions in the Attachment can only be answered with a YES or NO. Obtaining answers to these questions only, however does not constitute a thorough and complete audit of a quality system. The questions are intended only to serve as indicators and reminders of important points to pursue in the objective audit of the system.
It is further emphasized that an affirmative answer for all questions may not be necessary.
The numbering in Attachment 2 follows the "18-Point Quality Criteria" with three additions - see Attachment 1.
Where in particular cases a closer audit of measurement and calibration systems is required, specific questions for such an audit are listed in Attachment 3.
Functionally simple and rugged measuring equipment shall be the subject of records (individual or collective) or other means of showing that they are within their calibration interval and designated limits.
All other measuring equipment and measurement standards shall be the subject of records which shall always include the information contained in Attachment 4.
Attachment 1.
The 18-Point Quality Criteria
- QA Program/System
- Organization
- Design Control
- Procurement Document Control
- Written Work Instructions/Workmanship
- Documentation and Change Control
- Control of Purchased Material/Purchaser Supplied Items and Services
- Identification and Control of Materials
- Control of Special Processes
- Inspection/Manufacturing Control/Sampling Procedures/Inspection Status
- Test Control
- Control of Inspection/Measuring and Test Instruments/Equipment
- Material Handling, Storage, Shipping and Preservation
- Completed Item Inspection and Testing
- Non-Conforming Materials/Items
- Corrective Actions
- QA Records
- Audits/Review
Additional:
A. Planning
B. Training
C. Subcontractors
Attachment 2.
Nr. | Quality Criteria | Yes/No |
1. |
QA Program/System a) Has the supplier established and documented a formal system of quality management? |
|
2. |
Organization a) Has a representative responsible for inspection been appointed? |
|
3. |
Design Control a) Does the supplier's system provide for a planned program of design and development? |
|
4. |
Procurement Document Control |
|
4.1 |
Inspection and Test Procedures a) Does the supplier have appropriate documented inspection procedures for, as a minimum, those inspection stages where inspection is performed to demonstrate conformance to specified requirements? c) Do they include criteria for acceptance or rejection and identify the inspection equipment to be used? |
|
4.2 |
Technical Data and Changes a) Does the supplier have procedures that ensure that only the latest applicable technical data are used for inspection purposes? |
|
5 |
Written Work Instructions/Workmanship |
|
5.1 |
a) Are documented instructions available for work operations where lack of instructions would adversely affect work performances? |
|
5.2 |
Workmanship a) Has the supplier established satisfactory standards of workmanship? |
|
6. |
Documentation and Change Control |
|
a) Does the system provide for clear and precise stipulation of responsibilities in documentation issue and change control? |
||
7. |
Control of Purchased Material/ Purchaser Supplied Items and Services |
|
7.1 |
Purchasing a) Does the system ensure that material and services supplied by subcontractors meet contract requirements? |
|
7.2 |
Purchasing Data a) Does the system ensure that material and services supplied by subcontractors meet contract requirements? |
|
7.3 |
Receiving Inspection a) Does the supplier inspect incoming material to the extent necessary upon receipt? |
|
7.4 |
Verification of Purchased Material a) Do subcontracts afford the Purchaser's Representative the right to verify conformance at source when required by the contract? |
|
7.5 |
Purchaser Supplied Material a) Does the supplier examine "supplied material" upon receipt for damage, quantity, completeness and type? |
|
8. |
Identification and Control of Materials Included in number 7 |
|
9. |
Control of Special Processes |
|
9.1 |
Special Processes a) Do any of the supplier's manufacturing processes fall into the category of special processes? |
|
9.2 |
In-Process Inspection a) Is inspection performed during manufacture on all characteristics which cannot be inspected at a later stage? |
|
10. |
Inspection/Manufacturing Control/Sampling Procedures/ Inspection Status |
|
10.1 |
Inspection Representative a) Is there a nominated person responsible for the inspection function? |
|
10.2 |
Manufacturing Control - General a) Are all production processes accomplished under controlled conditions? |
|
10.3 |
Indication of Inspection Status a) Does the supplier employ an effective system for indicating the inspection status of material? |
|
10.4 |
Sampling Procedures a) Are recognized standards on sampling being utilized or are supplier-designated sampling plans available for review by the Purchaser's Representative? |
|
10.5 |
Alternative Inspection Procedures and Equipment a) Is the supplier's proposal to use alternative inspection procedures and equipment backed by valid evidence? |
|
11. |
Test Control (Later) |
|
12. |
Control of Inspection Measuring and Test / Instruments/ Equipment a) Does the supplier have a documented measurement and calibration system? |
|
13. |
Material Handling, Storage, Shipping and Preservation |
|
13.1 |
General a) Does the system provide for the identification, as necessary, of the material from the time of receipt until the supplier's responsibility ceases? |
|
13.2 |
Material Handling a) Has the supplier instructions or procedures, where necessary, to control handling and transport operations? |
|
13.3 |
Storage a) Are there procedures and regular schedules for the inspection of products in storage and are these procedures adequate to prevent deterioration or damage? |
|
13.4 |
Delivery a) Is all material to be stored or shipped properly identified and labelled? |
|
14. |
Completed Item Inspection and Testing a) Are completed items given a final inspection and test to establish overall quality? |
|
15. |
Non-conforming Materials/Items a) Does the supplier have an effective system for controlling non-conforming material? |
|
16. |
Corrective Actions a) Does the system provide for prompt detection of inferior quality and for correction of its assignable causes? |
|
17. |
QA Records a) Are there records of essential quality assurance activities? |
|
18. |
Audits/Review a) Does the supplier's management carry out periodic reviews? |
|
A. |
Planning a) Has the supplier obtained all the information needed to execute the contract? |
|
B. |
Training a) Are arrangements for personnel training satisfactory? |
|
C. |
Subcontractors a) refer to 3.i; |
Attachment 3.
Checklist for Measurement and Calibration Systems
Nr. | Subject | Yes/No |
1. |
Calibration System a) Are there prescribed procedures for the control and calibration of all measurement standards and measuring equipment? |
|
2. |
Periodic Review of the Calibration System a) Is the procedure for the review of the measurement and calibration system documented? |
|
3. |
Planning a) Are the needs of calibration and measurement properly planned before starting new work? |
|
4. |
Measurement Limits a) Does the calibration system identify the source and magnitude of uncertainties associated with calibration and product characteristic measurements? |
|
5. |
Documented Calibration Procedures a) Are there prescribed procedures for controlling the calibration of measurement standards and is measuring equipment available and used for product verification? |
|
6. |
Records a) Is there a system of record keeping that is appropriate to the calibration and measurement system in use? |
|
7. |
Calibration Labelling a) Is there a prescribed system of labelling or coding that identifies the calibration status of measurement standards and measuring equipment? |
|
8. |
Sealing for Integrity a) Are there adequate procedures for sealing against misuse or accidental shift of present controls? |
|
9. |
Intervals of Calibration a) Have calibration intervals been established for all measurement standards and measuring equipment? |
|
10. |
Invalidation of Calibration a) Do the prescribed procedures ensure the immediate removal from use, or conspicuous identification of any measurement standard or measuring equipment that: |
|
11. |
Subcontractors a) Do procedures ensure that a subcontractor employs a measurement and calibration system that complies with the requirements of this appendix? |
|
12. |
Storage and Handling a) Is there an adequate system for the handling, transporting and storing of measurement standards and measuring equipment? |
|
13. |
Traceability a) Can all calibrations performed in-house or by subcontractors be traced through an unbroken chain of properly conducted calibrations to a national or international measurement standard? |
|
14. |
Cumulative Effect of Errors a) Do the procedures take into account the cumulative effect of errors and uncertainties in carrying out calibrations? |
|
15. |
Environmental Control a) Is environmental control provided where necessary? |
|
16. |
Evaluation of Calibration System a) Is reasonable access made available for the evaluation of the system? |
|
17. |
Training a) Have all personnel performing calibration functions the appropriate experience or training? |
Attachment 4.
Measuring Equipment and Measurement Standard Records.
Functionally complicated and delicate measuring equipment and measurement standards are subject to a records system that shall include the following information as a minimum:
- a) the description of equipment and unique identification;
- b) the date on which each calibration was performed;
- c) the results obtained from calibration;
- d) the planned calibration interval;
- and, when appropriate, the following additional information:
- e) the designated permissible limits of error;
- f) the reference to calibration procedures;
- g) the source of calibration used to establish traceability;
- h) the environmental condition for calibration and the measurement data as measured and as corrected to reference conditions;
- i) a statement of the cumulative effect of uncertainties on the data obtained in the calibration;
- j) details of any maintenance (servicing, adjustment, repairs) or modifications that could affect the calibration status;
- k) any limitations in use.