The general standards provide examples, templates and basic information for preparing general project execution documents These standards are usually not part of the auditable section of the QA system. The focus of the guides is primarily related to project execution because the procedures are written from the perspective of an Engineering Contractor.
The below listing gives an indication of the available procedures. Use Library Menu navigation bar at the left to view the public procedures on this website or use this link to go directly to the QA system documents >
Number | Title |
BN-S-UC001 | Standard Checklist for Plant Completion |
BN-S-UC001A | Mechanical Completion, Checklist for |
BN-S-UC001B | Mechanical Completion Including Pre-Commissioning Activities, Checklist for |
BN-S-UC001C | Preparation for Start-up, Checklist for |
BN-S-UC002 | Safety, Health, Welfare and Environmental Policy, Safety Rules and Site Regulations |
BN-S-UC003 | Standard (Template) Construction Phase Safety Health Welfare and Environment Plan (SHWE Plan) |
BN-S-UK001 | Project Procedure and Execution Manual (Standard)_ |
BN-S-UK001/13 | Project Quality Plan |
BN-S-UK001/7 | Project Organization Charts |
BN-S-UK001/8 | Project Function Descriptions |
BN-S-UK001/9 | Audit Schedule |
BN-S-UK003 | Review of Documents In Design Reviews, Checklist for |
BN-S-UK004 | Design Review Technical Disciplines, Checklist |
BN-S-UK009 | Environmental, Health and Safety (EH&S) Questionnaires |
BN-S-UK010 | Project Procedure and Execution Manual for the ....... Project (Reduced Sized PPEM) |
BN-S-UK011 | Project Home Office Safety, Health, Welfare and Environmental Plan |
BN-S-UP101 | General Conditions of Subcontract for Professional and Engineering Services |
BN-S-UP102 | General Conditions for Construction Work for Supply and Erect Orders |
BN-S-UP103 | General Terms and Conditions of Subcontract |
BN-S-UP105 | Subcontractor Questionnaire |