The general guides are related to executing work such as inspections, auditing but also guide lines for testing for example equipment. These guides are usually not part of the auditable section of the QA system. The focus of the guides is primarily related to project execution because the procedures are written from the perspective of an Engineering Contractor.
The below listing gives an indication of the available procedures. Use Library Menu navigation bar at the left to view the public procedures on this website or use this link to go directly to the QA system documents >
Number | Title |
BN-G-U001 | Terminology |
BN-G-U002 | Engineering Safety, Health, Welfare and Environmental (SHWE) Program (SHWE in Design Features) |
BN-G-UC001 | Control of Welding Materials at Job Site |
BN-G-UC002 | Control of Measuring and Testing Equipment |
BN-G-UC004 | Field Construction Safety, Health, Welfare and Environmental Program |
BN-G-UC005 | Evaluation of Safety Plans |
BN-G-UC006 | Guidelines for the Investigation of Incidents, (Near miss) Accidents |
BN-G-UE201 | User Reference Guide Materials Management Tools Company Automated Materials Program |
BN-G-UE202 | Bulk Material Management Execution Plan and Procedures, Guide for |
BN-G-UE301 | Control Systems Guide for Interface Between Constrol Systems and Electrical Group |
BN-G-UK001 | Evaluation of Quality Plans |
BN-G-UK002 | Qualifications of Quality Assurance Personnel |
BN-G-UK003 | Project Audits of all Disciplines |
BN-G-UK005 | Evaluation of Quality Manuals |
BN-G-UK030/5 | Quality Control Report Piping Details (Form) |
BN-G-UK107 | Instrument Price Database with Curves - Improved Instrument Estimating Project (IIEP) |
BN-G-UL001 | Department Audit Checklist |
BN-G-UL002 | Human Resources Standard Reports |
BN-G-UP201 | Vendor Inspections and Test |
BN-G-UP202 | Qualifications of Inspection Personnel |
BN-G-UP203 | QA Evaluation of Suppliers |
BN-G-US001 | Computer Operations Guide |
BN-G-US004 | Computer Room Keys Memo |
BN-G-US005 | ICT PC Virus Guide |
BN-G-US007 | Data Administration and Sql Access Guide |
BN-G-Y001 | Foreword |
BN-G-Y002 | Site Quality Organization, Responsibilities and Interfaces |
BN-G-Y003 | Subcontractor's Quality System |
BN-G-Y004 | Quality Records |
BN-G-Y005 | Quality Auditing |
BN-G-Y006 | Listing of References, Code and Standards |
BN-G-Y007 | Engineering Document Control |
BN-G-Y008 | Materials Quality Management |
BN-G-Y009 | Care and Preservation of Equipment During Construction |
BN-G-Y010 | Nonconformance Management System |
BN-G-Y011 | Civil Inspection and Testing |
BN-G-Y012 | Rotating Equipment Inspection and Testing |
BN-G-Y013 | Mechanical Equipment Inspection and Testing |
BN-G-Y014 | Heating, Ventilation and Airconditioning Inspection and Testing |
BN-G-Y015 | Piping Systems Inspection and Testing |
BN-G-Y016 | Flushing |
BN-G-Y017 | Welding Inspection |
BN-G-Y018 | Non-Destructive Examination |
BN-G-Y019 | Instrumentation Inspection and Testing |
BN-G-Y020 | Electrical Inspection and Testing |
BN-G-Y021 | Painting and Insulation Inspection and Testing |
BN-G-Y022 | Punchlisting, Completion and Turnover |
BN-G-Y023 | Standard Checklist for Plant Completion |