The project construction phase of a process plant requires adequate management and control of quality, cost and timinig. Various hold points and check points are part of the construction execution to ensure that the construction work is progressing according plan.
During the construction various forms are completed to document the check and hold points. These forms are required to demonstrate to the client and end-user that proper measures are taken to assure a high quality end product.
Number(.PDF) | Description |
RB26C01 | Piping Test System Register |
RB26C02 | Inspection Record for Piping Release for Flushing and Pressure Testing |
RB26C03 | Inspection and Test Record for Piping Completion and Certificate for Flushing, Pressure Testing, Blowing, Reinstatement and Completion |
RB26C04 | Inspection and Test Record for Underground Piping |
RB26C05 | Pressure Test Record (Piping) |
RB26C30 | Inspection Record for Site Welding |
RB26C31 | Weld Repair Report |
RB26C32 | Inspection Report for Field Welds |
RB26C33 | Radiograph Inspection Report |
RB26C34 | Radiography Record Sheet |
RB26C35 | Record of Welder Performance Qualification Test on Groove Welds |
RB26E01 | Inpsection Record for Underground Cable Pulling |
RB26E02 | Inspection Record for Cable Trays/Ladders |
RB26E03 | Inpsection and Test Record for L.V. Cable |
RB26E04 | Test Record for Distribution Feeder Cable (M.V./H.V.) |
RB26E05 | Inspection Record for Earting Systems |
RB26E06 | Continuity Tests Record of Earthing Conductors for Equipment |
RB26E07 | Earth Electrode Resistance Test Record |
RB26E08 | Inspection Record for Electrical Heat Tracing |
RB26E09 | Inspection Record for Basic Inspection of Electrical Equipment |
RB26E10 | Inspection Record for Switch Houses (including transformer yards) |
RB26E11 | Inspection and Test Record for Bus-Bar Assemblies - HV Switchgear |
RB26E12 | Inspection and Test for Record for Switching Units - HV Switchgear |
RB26E13 | Inspection and Test Record for Bus-Bar Assemblies - LV Switchgear (including incoming and sectionalizer units) |
RB26E14 | Inspection and Test Record for Outgoing Units - LV Switchgear |
RB26E15 | LV Overcurrent and Earth-Fault Protection Relay Test Record |
RB26E16 | Inspection and Test Record for Power Transformer |
RB26E17 | Inspection and Test Record for Voltage Transformer (and UV Relay) |
RB26E18 | Test Record for Current Transformer (and Ammeter) |
RB26E19 | Test Record for Overcurrent/Earth/Fault Protection Relay (induction type) |
RB26E20 | Test Record for Overcurrent/Earth/Fault Protection Relay (thermal type) |
RB26E21 | Test Record for Differential Protection Relay |
RB26E22 | Inspection and Test Record for Electric Motor - Cage-Induction Type (including control unit) |
RB26E23 | Inspection and Test Record for Static Supply Unit |
RB26E24 | Inspection and Test Record for Emergency Generators |
RB26E25 | Inspection and Test Record for Lighting Installation (including distribution board) |
RB26G01 | Inspection Record for Air Handling Units |
RB26G02 | Inspection Record for Airflow Control Devices |
RB26G03 | Inspection Record for Air Diffusing Equipment |
RB26G04 | Inspection Record for Air Ducting System |
RB26G05 | Test Record for Pressure/Vacuum** Test of HVAC System |
RB26G06 | Overall Inspection Record for HVAC System |
RB26J01 | Setting-out Report for Plant Benchmarks |
RB26J02 | Piling Report |
RB26J03 | Inspection Record for Concrete Works (Authorization to Pour) |
RB26J04 | Concrete Placement Record |
RB26J05 | Inspection Record for Finished Concrete Works |
RB26J06 | Concrete Cylinder/Cube Report |
RB26J07 | Concrete Test Results |
RB26J08 | Summary of Concrete Test Results |
RB26J09 | Foundation Settlement Data Report |
RB26J10 | Inspection Record for Grouting |
RB26J11 | Inspection and Test Record for Sewers |
RB26J12 | Inspection and Test Record for Waterproof Membrane of Basin |
RB26J13 | Inspection Record for Paving and Subgrade/Soil in General |
RB26J14 | Inspection Record for Roads/Carparks |
RB26J15 | Inspection and Test Record for Retention Basins |
RB26J16 | Inspection Record for Steel Structures |
RB26J17 | Inspection Record for Fireproofing |
RB26J18 | Inspection Record for Refractory Linings |
RB26J19 | Inspection Record for Blockwork |
RB26J20 | Inspection Record for Wall Insulation of Buildings |
RB26J21 | Inspection Record for Roof Insulation and Roofing of Buildings |
RB26J22 | Inspection Record for Wall Cladding of Buildings/Structures |
RB26J23 | Inspection Record for Suspended Ceiling of Buildings |
RB26J24 | Inspection Record for Windows, Doors, Openings of Buildings |
RB26J25 | Inspection and Test Record for Plumbinb/Sanitary Installation of Buildings |
RB26J26 | Inspection Record for Internal Finishing of Buildings |
RB26J27 | Inspection Record for Complete Building (minor building) |
RB26J28 | Inspection Record for Fencing |
RB26J29 | Inspection Record for Gates |
RB26J30 | Inspection and Test Record for Boom Gates |
RB26K01 | Inspection and Test Record for Loop Checks |
RB26K02 | Inspection and Test Record for Instrument Pre-installation and Calibration |
RB26K03 | Inspection and Test Record for Control Valve Pre-installation |
RB26K04 | Inspection and Test Record for Trip and Alarm Checks |
RB26K05 | Inspection for Instrument Installation and Mechanical Acceptance Form |
RB26K06 | Inspection Record for Cabinets/Consoles |
RB26K07 | Inspection Record for Installation Acceptance of Safeguarding System and/or Sequential System |
RB26K08 | Inspection Record for Installation Acceptance of DCS System |
RB26K09 | Inspection Record for Junction Boxes |
RB26K10 | Inspection Record for Instrument Earting System |
RB26K11 | Inspection Record for Instrument Air Supply Pressure Test |
RB26K12 | Inspection Record for On-line Stream Analyzers (General) and Analyzer House |
RB26K13 | Inspection Record for Process Gas Chromatograph and Acceptance Sheet |
RB26K14 | Inspection Record for Erection of Flow, Pressure, Level, Switches |
RB26K15 | Cable Insulation and Continuity Test Report Instrument Cables |
RB26K16 | Orifice Plate Installation Record |
RB26K17 | Tracking Document for Instrument Connections to Piping and Mechanical Equipment |
RB26K18 | Preliminary Mechanical Acceptance Report for Instrumentation |
RB26K19 | Inspection Record for Local Indicating Instruments Pressure, Temperature, Flow and Level Gauges |
RB26K20 | Inspection Record for Instrument Impulse Hook-ups |
RB26M01 | Equipment Incoming Inspection Record |
RB26M02 | Inspection Record for Towers/Vessels and Closing Certificate |
RB26M03 | Inspection and Test Record for Tanks and Closing Certificate |
RB26M04 | Tank Test Certificate |
RB26M05 | Record of Vessel Tests |
RB26M06 | New Equipment Data - Radiographic Inspection Report |
RB26M07 | Inspection Record for Exchangers |
RB26M08 | Inspection Record for Air Coolers |
RB26M09 | Run-in Test Record for Air Coolers |
RB26M10 | Inspection Record for Mixers |
RB26M11 | Inspection Record for Cooling Towers and Closing Certificate |
RB26M12 | Inspection Record for Furnaces/Boilers and Closing Certificate |
RB26M13 | Inspection Record for Packaged Boiler Units and Closing Certificate |
RB26M14 | Inspeciton Record for Packaged Units: Vessels/Columns/Skids/Filters and Closing Certificate |
RB26M15 | Inspection Checklist for Travelling Cranes |
RB26M16 | Inspection and Test for Elevator and Hydraulic Lift Table |
RB26N01 | Inspection and Test Record for Painting |
RB26N02 | Inspection and Test Record for Insulation |
RB26P01 | Inspection and Test Record for Pump/Compressor Set |
RB26P02 | Test Record for Rotating Equipment Alignment |
RB26P03 | Inspection and Test Record for Alignment of Belt-driven Rotating Equipment |
RB26P04 | Inspection and Test Record for Mixers |
RBY002 | Site Quality Responsibilities Matrix |
RBY003 | Inspection and Test Plan (ITP) |
RBY005A | Quality Audit Schedule |
RBY005B | Notice of Quality Audit |
RBY005C | Report of Quality Audit |
RBY005D | Quality Audit Report Questionnaire |
RBY005E | Quality Audit Report Conclusions |
RBY005F | Quality Audit Log and Status Report |
RBY007A | Site Engineering Query (SEQ) |
RBY007B | Site Engineering Query Log and Status Report |
RBY010A | Nonconformance Report |
RBY010B | Nonconformance Log and Status Report |
RBY022A | Subcontractor's Request for Punchlisting |
RBY022B | Punchlist |
RBY022C | Punchlist Log and Status Report |
RBY022D | Certificate of Functional system Mechanical Completion - Ready for Start-up* and Turnover |