Project Account and Cost Code for Painting
| Stem sub | Rest | Detail | Level | UoM | Description |
| R |
|
|
1 |
|
Painting |
| |
|
|
|
|
|
| R* |
|
|
2 |
|
Painting Group |
| RA |
|
|
2 |
M2 |
Painting of Equipment A/M/T/H |
| RP |
|
|
2 |
M2 |
Painting of Equipment P/G |
| RF |
|
|
2 |
M2 |
Painting of Storage Tanks |
| RC |
|
|
2 |
M |
Painting of Piping |
| RD |
|
|
2 |
M2 |
Painting of Structural Steel |
| RY |
|
|
2 |
M2 |
Misc. Painting |
| |
|
|
|
|
|
| RA |
* |
|
3 |
|
Painting Location |
| RA |
F |
|
3 |
M2 |
Field |
| RA |
S |
|
3 |
M2 |
Shop |
| |
|
|
|
|
|
| RA |
_* |
|
4 |
|
Equipment Group |
| RA |
_A |
|
4 |
M2 |
Towers |
| RA |
_M |
|
4 |
M2 |
Vessels |
| RA |
_T |
|
4 |
M2 |
Exchangers |
| RA |
_H |
|
4 |
M2 |
Heaters |
| |
|
|
|
|
|
| RA |
__* |
|
5 |
|
Number of Coats |
| RA |
__1 |
|
5 |
M2 |
1 Coat |
| RA |
__2 |
|
5 |
M2 |
2 Coats |
| RA |
__3 |
|
5 |
M2 |
3 Coats |
| RA |
__4 |
|
5 |
M2 |
4 Coats |
| RA |
___* |
|
6 |
|
Surface Preparation |
| RA |
___A |
|
6 |
M2 |
Degreasing & Touch Up |
| RA |
___B |
|
6 |
M2 |
Wirebrushing |
| RA |
___C |
|
6 |
M2 |
Blast Cleaning Sa2 |
| RA |
___D |
|
6 |
M2 |
Blast Cleaning Sa2.5 |
| RA |
___E |
|
6 |
M2 |
Blast Cleaning Sa3 |
| RA |
|
___*** |
7 |
|
Layer Thickness (micron) |
| RA |
|
___... |
7 |
M2 |
- any number - |
| |
|
|
|
|
|
| RA |
____* |
|
8 |
|
Paint Material |
| RA |
____1 |
|
8 |
M2 |
Alkyd |
| RA |
____2 |
|
8 |
M2 |
Chloor Rubber |
| RA |
____3 |
|
8 |
M2 |
Epoxy |
| RA |
____4 |
|
8 |
M2 |
High Built Epoxy |
| |
|
|
|
|
|
| RA |
_____* |
|
9 |
|
Application Method |
| RA |
_____1 |
|
9 |
M2 |
Brushing |
| RA |
_____2 |
|
9 |
M2 |
Spraying |
| |
|
|
|
|
|
| RP |
* |
|
3 |
|
Painting Location |
| RP |
F |
|
3 |
M2 |
Field |
| RP |
S |
|
3 |
M2 |
Shop |
| |
|
|
|
|
|
| RP |
_* |
|
4 |
|
Type of Equipment |
| RP |
_P |
|
4 |
M2 |
Pumps & Compressors |
| RP |
_G |
|
4 |
M2 |
Special Equipment |
| |
|
|
|
|
|
| RP |
__* |
|
5 |
|
Number of Coats |
| RP |
__1 |
|
5 |
M2 |
1 Coat |
| RP |
__2 |
|
5 |
M2 |
2 Coats |
| RP |
__3 |
|
5 |
M2 |
3 Coats |
| RP |
__4 |
|
5 |
M2 |
4 Coats |
| RP |
___* |
|
5 |
|
Surface Preparation |
| RP |
___A |
|
5 |
M2 |
Degreasing & Touch Up |
| RP |
___B |
|
5 |
M2 |
Wirebrushing |
| RP |
___C |
|
5 |
M2 |
Blast Cleaning Sa2 |
| RP |
___D |
|
5 |
M2 |
Blast Cleaning Sa2.5 |
| RP |
___E |
|
5 |
M2 |
Blast Cleaning Sa3 |
| Stem sub | Rest | Detail | Level | UoM | Description |
| |
|
|
|
|
|
| RP |
____* |
|
5 |
|
Paint Material |
| RP |
____1 |
|
5 |
M2 |
Alkyd |
| RP |
____2 |
|
5 |
M2 |
Chloor Rubber |
| RP |
____3 |
|
5 |
M2 |
Epoxy |
| RP |
____4 |
|
5 |
M2 |
High Built Epoxy |
| |
|
|
|
|
|
| RP |
_____* |
|
5 |
|
Application Method |
| RP |
_____1 |
|
5 |
M2 |
Brushing |
| RP |
_____2 |
|
5 |
M2 |
Spraying |
| |
|
|
|
|
|
| RP |
|
___*** |
6 |
|
Layer Thickness (micron) |
| RP |
|
___... |
6 |
M2 |
- any number - |
| |
|
|
|
|
|
| |
|
|
|
|
|
| RF |
* |
|
3 |
|
Painting Location |
| RF |
F |
|
3 |
M2 |
Field |
| RF |
S |
|
3 |
M2 |
Shop |
| |
|
|
|
|
|
| RF |
_* |
|
4 |
|
Painting Surface |
| RF |
_E |
|
4 |
M2 |
External |
| RF |
_I |
|
4 |
M2 |
Internal |
| |
|
|
|
|
|
| RF |
__* |
|
5 |
|
Number of Coats |
| RF |
__1 |
|
5 |
M2 |
1 Coat |
| RF |
__2 |
|
5 |
M2 |
2 Coats |
| RF |
__3 |
|
5 |
M2 |
3 Coats |
| RF |
__4 |
|
5 |
M2 |
4 Coats |
| RF |
___* |
|
5 |
|
Surface Preparation |
| RF |
___A |
|
5 |
M2 |
Degreasing & Touch Up |
| RF |
___B |
|
5 |
M2 |
Wirebrushing |
| RF |
___C |
|
5 |
M2 |
Blast Cleaning Sa2 |
| RF |
___D |
|
5 |
M2 |
Blast Cleaning Sa2.5 |
| RF |
___E |
|
5 |
M2 |
Blast Cleaning Sa3 |
| RF |
____* |
|
5 |
|
Paint Material |
| RF |
____1 |
|
5 |
M2 |
Alkyd |
| RF |
____2 |
|
5 |
M2 |
Chloor Rubber |
| RF |
____3 |
|
5 |
M2 |
Epoxy |
| RF |
____4 |
|
5 |
M2 |
High Built Epoxy |
| |
|
|
|
|
|
| RF |
_____* |
|
5 |
|
Application Method |
| RF |
_____1 |
|
5 |
M2 |
Brushing |
| RF |
_____2 |
|
5 |
M2 |
Spraying |
| |
|
|
|
|
|
| RF |
|
___*** |
6 |
|
Layer Thickness (micron) |
| RF |
|
___... |
6 |
M2 |
- any number - |
| |
|
|
|
|
|
| RC |
* |
|
3 |
|
Painting Location |
| RC |
F |
|
3 |
M |
Field/Non Insulated |
| RC |
S |
|
3 |
M |
Shop |
| RC |
N |
|
3 |
M |
Field/Insulated |
| |
|
|
|
|
|
| RC |
__* |
|
4 |
|
Number of Coats |
| RC |
__1 |
|
4 |
M2 |
1 Coat |
| RC |
__2 |
|
4 |
M2 |
2 Coats |
| RC |
__3 |
|
4 |
M2 |
3 Coats |
| RC |
__4 |
|
4 |
M2 |
4 Coats |
| |
|
|
|
|
|
| RC |
___* |
|
5 |
|
Surface Preparation |
| RC |
___A |
|
5 |
M |
Degreasing & Touch Up |
| RC |
___B |
|
5 |
M |
Wirebrushing |
| RC |
___C |
|
5 |
M |
Blast Cleaning Sa2 |
| RC |
___D |
|
5 |
M |
Blast Cleaning Sa2.5 |
| RC |
___E |
|
5 |
M |
Blast Cleaning Sa3 |
| Stem sub | Rest | Detail | Level | UoM | Description |
| |
|
|
|
|
|
| RC |
_* |
|
6 |
|
Piping Component |
| RC |
_B |
|
6 |
EA |
Fittings |
| RC |
_F |
|
6 |
EA |
Flanges |
| RC |
_M |
|
6 |
EA |
Manifolds |
| RC |
_P |
|
6 |
M |
Pipe |
| RC |
_V |
|
6 |
EA |
Valves |
| RC |
_X |
|
6 |
EA |
Piping |
| RC |
|
* |
7 |
|
Size Group |
| RC |
|
** |
8 |
|
Size |
| |
|
|
|
|
|
| RC |
|
1 |
7 |
|
< 2" |
| RC |
|
10 |
8 |
|
Small Bore |
| RC |
|
11 |
8 |
|
1/8" |
| RC |
|
12 |
8 |
|
0.25" |
| RC |
|
13 |
8 |
|
3/8" |
| RC |
|
14 |
8 |
|
0.5" |
| RC |
|
15 |
8 |
|
5/8" |
| RC |
|
16 |
8 |
|
0.75" |
| RC |
|
17 |
8 |
|
1" |
| RC |
|
18 |
8 |
|
1.25" |
| RC |
|
19 |
8 |
|
1.5" |
| |
|
|
|
|
|
| RC |
|
2 |
7 |
|
2- 6" |
| RC |
|
20 |
8 |
|
Medium Bore |
| RC |
|
21 |
8 |
|
2" |
| RC |
|
22 |
8 |
|
2.5" |
| RC |
|
23 |
8 |
|
3" |
| RC |
|
24 |
8 |
|
4" |
| RC |
|
25 |
8 |
|
5" |
| RC |
|
26 |
8 |
|
6" |
| |
|
|
|
|
|
| RC |
|
3 |
7 |
|
8-12" |
| RC |
|
30 |
8 |
|
Large Bore |
| RC |
|
31 |
8 |
|
8" |
| RC |
|
32 |
8 |
|
10" |
| RC |
|
33 |
8 |
|
12" |
| |
|
|
|
|
|
| RC |
|
4 |
7 |
|
14-24" |
| RC |
|
40 |
8 |
|
LB4 |
| RC |
|
41 |
8 |
|
14" |
| RC |
|
42 |
8 |
|
16" |
| RC |
|
43 |
8 |
|
18" |
| RC |
|
44 |
8 |
|
20" |
| RC |
|
45 |
8 |
|
22" |
| RC |
|
46 |
8 |
|
24" |
| |
|
|
|
|
|
| RC |
|
5 |
7 |
|
26-36" |
| RC |
|
50 |
8 |
|
LB5 |
| RC |
|
51 |
8 |
|
26" |
| RC |
|
52 |
8 |
|
28" |
| RC |
|
53 |
8 |
|
30" |
| RC |
|
54 |
8 |
|
32" |
| RC |
|
55 |
8 |
|
34" |
| RC |
|
56 |
8 |
|
36" |
| |
|
|
|
|
|
| RC |
|
6 |
7 |
|
38-48" |
| RC |
|
60 |
8 |
|
LB6 |
| RC |
|
61 |
8 |
|
38" |
| RC |
|
62 |
8 |
|
40" |
| RC |
|
63 |
8 |
|
42" |
| RC |
|
64 |
8 |
|
44" |
| RC |
|
65 |
8 |
|
46" |
| RC |
|
66 |
8 |
|
48" |
| Stem sub | Rest | Detail | Level | UoM | Description |
| |
|
|
|
|
|
| RC |
|
7 |
7 |
|
>48" |
| RC |
|
70 |
8 |
|
LB7 |
| RC |
|
71 |
8 |
|
52" |
| RC |
|
72 |
8 |
|
54" |
| RC |
|
73 |
8 |
|
56" |
| RC |
|
74 |
8 |
|
58" |
| RC |
|
75 |
8 |
|
60" |
| RC |
|
76 |
8 |
|
64" |
| RC |
|
77 |
8 |
|
68" |
| |
|
|
|
|
|
| RC |
____* |
|
9 |
|
Paint Material |
| RC |
____1 |
|
9 |
M |
Alkyd |
| RC |
____2 |
|
9 |
M |
Chloor Rubber |
| RC |
____3 |
|
9 |
M |
Epoxy |
| RC |
____4 |
|
9 |
M |
High Built Epoxy |
| |
|
|
|
|
|
| RC |
|
___*** |
10 |
|
Layer Thickness (micron) |
| RC |
|
___... |
10 |
M |
- any number - |
| |
|
|
|
|
|
| RC |
_____* |
|
11 |
|
Application Method |
| RC |
_____1 |
|
11 |
M |
Brushing |
| RC |
_____2 |
|
11 |
M |
Spraying |
| |
|
|
|
|
|
| RD |
* |
|
3 |
|
Painting Location |
| RD |
F |
|
3 |
M2 |
Field |
| RD |
S |
|
3 |
M2 |
Shop |
| |
|
|
|
|
|
| RD |
_* |
|
4 |
|
Steel Category |
| RD |
_A |
|
4 |
M2 |
Members < 22 kg/M |
| RD |
_B |
|
4 |
M2 |
Members 22- 70kg/M |
| RD |
_C |
|
4 |
M2 |
Members 70-120kg/M |
| RD |
_D |
|
4 |
M2 |
Members >120 kg/M |
| RD |
_F |
|
4 |
M2 |
Flooring |
| RD |
_H |
|
4 |
M2 |
Handrail |
| RD |
_L |
|
4 |
M2 |
Ladders with Cage |
| RD |
_S |
|
4 |
M2 |
Pipesupports |
| |
|
|
|
|
|
| RD |
__* |
|
5 |
|
Number of Coats |
| RD |
__1 |
|
5 |
M2 |
1 Coat |
| RD |
__2 |
|
5 |
M2 |
2 Coats |
| RD |
__3 |
|
5 |
M2 |
3 Coats |
| RD |
__4 |
|
5 |
M2 |
4 Coats |
| RD |
___* |
|
5 |
|
Surface Preparation |
| RD |
___A |
|
5 |
M2 |
Degreasing & Touch Up |
| RD |
___B |
|
5 |
M2 |
Wirebrushing |
| RD |
___C |
|
5 |
M2 |
Blast Cleaning Sa2 |
| RD |
___D |
|
5 |
M2 |
Blast Cleaning Sa2.5 |
| RD |
___E |
|
5 |
M2 |
Blast Cleaning Sa3 |
| |
|
|
|
|
|
| RD |
____* |
|
5 |
|
Paint Material |
| RD |
____1 |
|
5 |
M2 |
Alkyd |
| RD |
____2 |
|
5 |
M2 |
Chloor Rubber |
| RD |
____3 |
|
5 |
M2 |
Epoxy |
| RD |
____4 |
|
5 |
M2 |
High Built Epoxy |
| |
|
|
|
|
|
| RD |
_____* |
|
5 |
|
Application Method |
| RD |
_____1 |
|
5 |
M2 |
Brushing |
| RD |
_____2 |
|
5 |
M2 |
Spraying |
| |
|
|
|
|
|
| RD |
|
___*** |
6 |
|
Layer Thickness (micron) |
| RD |
|
___... |
6 |
M2 |
- any number - |